Sydney unveils a cultural landmark outside its historic centre. The Powerhouse Parramatta, on the banks of the Parramatta River, opened on 7 November 2026, seven years after Moreau Kusunoki won the 2019 international competition. According to local press, more than 26,000 people visited it the first weekend.

The project was developed with the local studio Genton and engineering by Arup. It totals 34,000 m² built and a budget of around A$915 million (approximately €564 million).

Two volumes and an exoskeleton. The building is organised into two compact blocks linked by a glazed walkway. Its most recognisable feature is a steel exoskeleton of large diagonals, leaving the galleries column-free. The larger volume exceeds 2,000 m² and reaches about 19 metres in height.

Designed to coexist with the river. The site is flood-able. The public floor is raised above a lower level designed to allow water to pass during floods.

An opening amid debate. Part of the Australian press has reported divided opinions on the cost. Prior to the opening, several executives temporarily stepped down from their positions during an internal investigation.

Sources: Metalocus · Australasian Leisure Management · Time Out Sydney · The Art Newspaper

Photo (free licence): Powerhouse Parramatta, North Forecourt · direct download Credit: Photo: KaiAdin / Wikimedia Commons, CC BY 4.0